top of page
webvervolg.png

consenting engineering support

Secure consent early, keep design options open

The preparation of Consent Application Documentation is a daunting task, especially if Offshore Windfarm designs are in an early, conceptual, stage. 


EOS Maritimes assists developers in developing early engineering and design concepts which will provide  text and design scenario values that are incluced in the Consenting Application documentation.

  

Our approach will allow for freedom of continuing the more detailed design and cable routing during the Consent Application period, as it enables the Developer to select from various WTG sizes, foundation types, OSP designs, Inter Array and Export cable burial depths and routes, and a variety of installation methods, at a later stage, as they are all covered in Maximum Design Scenarios within the Consent Appliation. 

Sergei-in-fleece-600x600.png

Start Your Project

Partner with us to deliver your offshore wind farm with Earlier First Power and industry-leading expertise.

bottom of page